The shelves have been taken apart and some of the furniture has been moved in preparation for the carpet installation.
ASTM Standards and Senior Design Projects ready to be moved.
The walls have been painted and some of the carpet tiles have been installed on the first floor.
A section of completed carpet installation on the first floor.
A view of the new carpet in front of the Archives.
Student employees shelving some of the books.
New carpet, new paint, and a new layout on the first floor.
Books and furniture in the new locations on the first floor.
Many of the bookshelves have been removed creating more study space.
Many of the print materials are moving to the first floor.
Some of the books were stored in study rooms until there was space set up on the first floor.
The second floor in front of the circulation desk was cleared out for the carpet installation.
The second floor circulation desk area with the old carpet removed.
A view of the new carpet on the west side and the old carpet on the east side of the second floor.
The new carpet and some furniture shifting.
The new carpet on the second floor and some furniture to be shifted.